Skip to main content
Associate II
Nov 7, 2026 10:39 PM UTC
Question

STM32N6/Nucleo power-off: PWR_ON at 1.63 V vs AUX-before-main requirement

Hello ST team,

I am using the NUCLEO-N657X0-Q and trying to understand the intended behavior when its common 5 V input is disconnected while the MCU is running, without first entering Standby.

There appears to be a mismatch between the current shutdown requirements and the PWR_ON-controlled supply arrangement. Could you help reconcile the following?

1. AN5967 Rev 6 (September 2026), section 3.5.2, requires the auxiliary supply group to discharge below 0.6 V before the main supply group falls outside its operating range.
https://www.st.com/resource/en/application_note/an5967-getting-started-with-hardware-development-for-stm32n6-mcus-stmicroelectronics.pdf#page=9

2. AN6000 Rev 1 (November 2024), section 3.2, describes uncontrolled input-power removal. Main VDD/AON fall until a power-down-reset threshold is crossed; PWR_ON then becomes high impedance and its approximately 40 kohm internal pull-down takes it LOW, disabling the core/auxiliary regulators.
https://www.st.com/resource/en/application_note/an6000-how-to-build-the-discrete-power-supply-for-stm32n6-mcus-stmicroelectronics.pdf#page=9

3. DS14791 Rev 11, Tables 25 and 27, specifies a 3.0 V minimum for VDD in the 3.3 V range and a 1.71 V minimum for VDDA18AON. Both falling PDR thresholds are 1.58-1.67 V, typically 1.63 V. Therefore, PDR-triggered cutoff alone appears too late to guarantee that AUX is already below 0.6 V while the main supplies are still valid.
https://www.st.com/resource/en/datasheet/stm32n657x0.pdf#page=140

On the stock MB1940-N657X0Q-C02 schematic, sheet 9:
- U33 (main 3.3 V / VDDIO) and U23 (1.8 V AON) have their enables tied to the incoming 5 V rail.
- U17 (core), U34 (auxiliary 3.3 V) and U26 (auxiliary 1.8 V) are enabled by PWR_ON.
- U26 is supplied from U34's output.
https://www.st.com/resource/en/schematic_pack/mb1940-n657x0q-c02-schematic.pdf#page=9

I understand that regulator dropout/UVLO and capacitor discharge can act before PDR. What I cannot see is how they guarantee the required ordering. I am not reporting a measured violation on a stock board; this is a question about the documented design requirements.

Could ST clarify:

1. Does AN5967 section 3.5.2 apply to sudden removal of the common input supply, or is there an exception for complete/uncontrolled shutdown? If there is an exception, what electrical limits apply?
2. How does the stock Nucleo meet the intended requirement during input removal? Is there an earlier shutdown mechanism, or specified regulator/discharge behavior that I am overlooking?
3. Which guidance should a new design follow: is the Nucleo-style PWR_ON arrangement sufficient, or is earlier input-failure detection plus main-supply hold-up required?

Related ST Community answers seem to distinguish these cases differently: the March 14, 2025 reply below accepts simultaneous shutdown, while the September 3, 2026 team response says sequencing is required to avoid inter-supply currents and an unstable shutdown state.
https://community.st.com/stm32-mcus-products-25/details-of-power-down-sequence-of-stm32n657x0h3q-148564
https://community.st.com/stm32-mcus-products-25/stm32n6-power-on-sequence-161758

I also checked ES0620 Rev 5 and did not find an erratum resolving this particular point. A clarification of how AN6000's uncontrolled shutdown relates to current AN5967 guidance would be very helpful.

Thank you.

2 replies

KDJEM.1
ST Technical Moderator
Nov 18, 2026 10:14 AM UTC

Hello ​@bigjosh ;

 

I reported this behavior internally for for review, and I will get back to you as soon as possible with more details.

Internal ticket number CDM0067597 (This is an internal tracking number and is not accessible or usable by customers).

 

Thank you.

Kaouthar

 

 

To give better visibility on the answered topics, please click on "Best answer" on the reply which solved your issue or answered your question.
KDJEM.1
ST Technical Moderator
Nov 18, 2026 2:23 PM UTC

Hello ​@bigjosh ;

 

A1. AN5967 describes the recommended power-up and power-down sequences under normal operating conditions. In the case of a complete or uncontrolled shutdown, no specific exception is defined. Therefore, the application hardware must be designed to ensure that all operating conditions remain within the limits specified in the datasheet, including absolute maximum ratings and voltage sequencing constraints, during the shutdown transients.

A2. The Nucleo board is intended as an evaluation and development platform and is not specifically designed to guarantee compliance with input-supply removal conditions. For technical recommendations related to power-down behavior, please refer to AN5967, Section 3.5.2, Power-Off Sequence. The end application is responsible for implementing any additional circuitry required to ensure compliance with the recommended power-down conditions.

A3. As a general recommendation, input-failure detection should be implemented at the main power-supply input. This approach provides sufficient voltage and timing margin to initiate and complete a controlled shutdown sequence before any supply rail falls outside its valid operating range. If required by the application, additional hold-up capacitance or other power-management circuitry should be used to ensure compliance with the recommended power-down sequence.

 

Thank you.

Kaouthar

To give better visibility on the answered topics, please click on "Best answer" on the reply which solved your issue or answered your question.