Question
Energy Harvester SPV1050 / STEVAL-ISV019V1: When connecting > 4-6uF on the LDO output, the LDO voltage collapses
I'm currently prototyping with the Steval-ISV019V1 (evaluation board for SPV1050) and have only changed the resistor ladder for MPPT. Energy harvesting works nice.
But when I enable one of the LDOs and have > 4-6uF connected on the LDO output, the LDO voltage collapses to around 0,8V. When I remove the capacitive load it takes a few seconds until it is possible to enable the LDO again and it starts working normal (stable 3.3V output).
Is this a normal behaviour of the SPV1050? I suppose not, may the chip is destroyed?
May someone can help with its knowledge?
Thanks!
